• Startseite / Willkommen
  • Betontechnologie / AAR / Bauwerkerhaltung
  • Materialbewirtschaftung
  • Aufbereitungstechnik
  • Mineralische Rohstoffe
  • TBM-Fräsbarkeitsstudien
  • Ausgewählte Projekte
  • Referenzen
  • Fachorganisationen
  • Kontakt
  • Page d'accueil (f)
    • Technologie du Béton
      • Réaction Alcalis-Granulats (RAG)
      • Entretien d'ouvrages en béton
    • Gestion et Emploi de Matériaux Excavés (GEME)
      • Matériaux excavés (MATEX)
      • Production de granulats
      • Laboratoire de chantier
      • Technique de préparation des granulats
      • Environnement et GVME
      • Concepts de GVME et appel d'offres
      • Cadre juridique
    • Ressources minérales
    • Projets particuliers
    • Projets de référence
    • Organisations professionnelles
  • Startpage (e)
    • Concrete Technology
      • Alkali-Aggregate Reaction (AAR)
      • Maintenance of concrete structures
    • Excavated materials
      • Spoil Management (SM)
      • Aggregate production
      • On-site laboratory
      • Processing technologies
      • Environment and SM
      • Concepts of SM and calls for tender
      • Legal basis of spoil management
    • Mineral ressources
    • Chosen projects
    • Reference projects
    • Professional organisations
Betontechnologie   +  Materialbewirtschaftung
Concrete Technology     +     Spoil Management
Technologie du Béton + Gestion et Valorisation
des Matériaux d'Excavation

Organizzazioni e associazioni professionali

Aktuell / Actuel / Actual


ASTRA: Gotthard road tunnel, 2nd tube

As part of the preparation of the implementation project, the B+ G was commissioned on 3 May 2016 to clarify the suitability of the excavated material and to assess its suitability for TBM excavation. For this purpose, exploratory drillings from the safety tunnel were carried out and analysed.

 

Since the end of 2021, B+G has also been acting as aggregate and concrete experts on behalf of the client.

@astra.ch
@espazium.ch
@astra.ch
@gotthard-strassentunnel.ch/Tunnelanlagen

TELT: Tunnel Euralpin Lyon-Turin (84km length)

Since 2021 B+ G supports a consortium for the tender of the material management lot. Based on our experience, the raw material is continuously tested in the construction site's own laboratory.

Concrete tests with sulphate-containing aggregates (produced from tunnel excavation) and special binders were carried out in the Modane intermediate attack on 7 April 2016. Among other things, the sulphate resistance is to be investigated.


Dam Spitallam KWO

The new Spitallam dam in the Bernese Oberland will require around 200,000m3 of concrete. The mass concrete consists of a maximum grain size of 125mm! A gravel plant was built for the production of the aggregates. B+ G supports the client KWO in the quality of raw materials, aggregates and concrete.




B+ G Betontechnologie +

Materialbewirtschaftung AG

Dorfstrasse 10
CH-3073 Gümligen
fon: +41 (0)31 960 43 28
fax: +41 (0)31 960 43 31

mail: info@BplusG.ch

Weitere Tätigkeiten:


Cookie-Richtlinie
Anmelden Abmelden | Bearbeiten
  • Nach oben scrollen
zuklappen